澶╃劧姘斿噣鍖栧鐞嗚缃
  Natural gas purification unit        Tel:86-755-25887166    Email:ywh166@126.com
 

Natural gas purification unit -- cyclone filter / quick open filter separator

 
       
  澶╃劧姘旇繃婊ゅ櫒璇存槑涔  
       
 
  Product Applied Fields
 
       
 

澶╃劧姘旇繃婊ゅ櫒璇存槑涔

 
   
       
 
  Main parts
 
       
 

澶╃劧姘旇繃婊ゅ櫒璇存槑涔

 
   
       
 
  Installation precautions
 
       
 

澶╃劧姘旇繃婊ゅ櫒璇存槑涔

 
   
       
 
  Maintenance and maintenance
 
       
 

澶╃劧姘旇繃婊ゅ櫒璇存槑涔

 
   
       

  Maintenance and maintenance
 
       
 

澶╃劧姘旇繃婊ゅ櫒璇存槑涔

 
   
       
 
  Maintenance and maintenance
 
       
 

澶╃劧姘旇繃婊ゅ櫒璇存槑涔

 
   
       
 
  Maintenance and maintenance
 
       
 

澶╃劧姘旇繃婊ゅ櫒璇存槑涔

 
   
       
 
back
 
  Natural gas purification unit        Tel:86-755-25887166    Email:ywh166@126.com
 

Natural gas purification unit -- cyclone filter / quick open filter separator

 
LKT LOCKS LINK QUICKLY OPENS BLIND BOARD
 
  Product Applied Fields
 
       
 

銆銆 鐕冩皵杩囨护鍣ㄥ箍娉涚敤浜庡喍閲戙佸寲宸ャ佺煶娌广侀犵焊銆佸尰鑽侀鍝併侀噰鐭裤佺數鍔涖佸煄甯傘佸搴瓑鐢ㄦ皵棰嗗煙銆傜噧姘旇繃婊ゅ櫒鏄緭閫佷粙璐ㄧ閬撲笂涓嶅彲缂哄皯鐨勪竴绉嶈缃紝閫氬父瀹夎鍦ㄥ噺鍘嬮榾銆佹硠鍘嬮榾銆佹祦閲忚銆佸畾浣嶉榾鎴栧叾瀹冭澶囩殑杩涘彛绔紝鐢ㄦ潵娑堥櫎浠嬭川涓殑鏉傝川锛屼互淇濇姢闃闂ㄥ強璁惧鐨勬甯镐娇鐢紝鍑忓皯璁惧缁存姢璐圭敤銆傚綋娴佷綋杩涘叆缃湁婊よ姱鐨勮繃婊ゅ櫒鍚庯紝鍏舵潅璐ㄨ婊よ姱闃绘尅锛岃屾竻娲佺殑婊ゆ皵鍒欑敱杩囨护鍣ㄥ嚭鍙f帓鍑猴紝褰撻渶瑕佹竻娲楁椂锛屽彧瑕佹妸婊ょ瓛鎷嗗紑锛屽皢婊よ姱鍙栧嚭锛屾竻娲楀悗閲嶆柊瑁呭叆鍗冲彲锛屽洜姝わ紝鐕冩皵杩囨护鍣ㄤ娇鐢ㄧ淮鎶ゆ柟渚裤

銆銆 Gas filter is widely used in metallurgy, chemical industry, petroleum, papermaking, medicine, food, mining, electric power, city, home and other gas fields. The gas filter is an indispensable device on the medium pipeline. It is usually installed at the inlet end of the pressure reducing valve, pressure relief valve, flowmeter, positioning valve or other equipment to eliminate the impurities in the medium, protect the normal use of the valve and equipment, and reduce the maintenance cost of the equipment. When the fluid enters the filter with a filter element, its impurities are blocked by the filter element, and the clean filter gas is discharged from the outlet of the filter. When cleaning is needed, just disassemble the filter cartridge, take out the filter element, and then install it again after cleaning. Therefore, the use and maintenance of the gas filter is convenient.

 
   
       
 
  Main parts
 
       
 
  1. 鐕冩皵杩囨护鍣 杩炴帴鍙e緞锛孌N15-DN600锛涜繃婊ょ簿搴 鈮100渭m 锛涘伐浣滄俯搴 -15鈩-+80鈩冿紱杩炴帴鏂瑰紡 铻虹汗/娉曞叞銆
  2. ******鍏佽鍘嬪姏锛1bar銆2bar銆6bar銆10bar銆16bar銆25bar銆40bar
  3. 鐕冩皵杩囨护鍣ㄩ傜敤浠嬭川锛氬煄甯傜叅姘斻佸ぉ鐒舵皵銆佹恫鍖栫煶娌规皵銆佷汉宸ョ叅姘旂瓑澶氱鏃犺厫铓鎬ф皵浣撱
  4. 浜氬▉鍗庣噧姘旇繃婊ゅ櫒鎬ц兘鐗圭偣锛氬潥鍥虹殑鏉愯川銆佹湁鏁堢殑杩囨护聽銆佺揣瀵嗙殑缁撴瀯銆佽交鏉剧殑淇濆吇銆佺噧姘旇繃婊ゅ櫒鍦ㄨ繘鍙e拰鍑哄彛鍧囪鏈夋祴鍘嬬偣銆
 
   
 
  1. Gas filter connection diameter, DN 15-dn 600; filtration accuracy 鈮 100 渭m; working temperature - 15 鈩 - + 80 鈩; connection mode: thread / flange.
  2. Maximum allowable pressure: 1bar, 2bar, 6bar, 10bar, 16bar, 25bar, 40bar
  3. Applicable medium of gas filter: City gas, natural gas, liquefied petroleum gas, artificial gas and other non corrosive gases.
  4. Yaweihua gas filter performance features: solid material, effective filtration, compact structure, easy maintenance, gas filter at the inlet and outlet are equipped with pressure measuring points.
   
       
 
  Installation precautions
 
       
 
  1. 1銆佺噧姘旇繃婊ゅ櫒閫氬父搴斿畨瑁呭湪璋冨帇鍣ㄤ箣鍓嶏紝涓斿繀椤绘牴鎹叾涓婃爣鏄庣殑姘斾綋娴佸姩鏂瑰悜瀹夎锛
  2. 2銆佺噧姘旇繃婊ゅ櫒鏄敱鍙礂鐨勫悎鎴愭潗鏂欑粍鎴愶紝瀹夎杩囨护鍣ㄨ娉ㄦ剰鐩栧瓙鑳藉鏂逛究鍦版墦寮锛屼究浜庢竻娲佸拰妫鏌ワ紱聽
  3. 3銆佺噧姘旇繃婊ゅ櫒鍙互瀹夎鍦ㄦ按骞冲拰鍨傜洿鐨勭閬撲笂锛屼笉瑕佹妸杩囨护鍣ㄥ畨瑁呭湪涓嶇ǔ鍥虹殑鍩虹涓婏紱聽
  4. 4銆佸湪妫淇箣鍓嶏紝璇锋偍鍔″繀纭鐕冩皵杩囨护鍣ㄥ唴娌℃湁鐕冩皵涔嬪悗锛屽皢杩囨护缃戝嵏涓嬶紝鐢ㄧ浉搴旂殑娲楁钉鍓傛竻娲楋紝鐒跺悗鑷劧椋庡共锛屽啀閲嶆柊瀹夎銆
  5. 5銆佸畨瑁呭畬姣曞悗锛屽繀椤诲仛瀵嗗皝鎬ф楠屻傘閫氭皵鏃讹紝鐬棿姘旈噺涓嶅疁杩囧ぇ銆

1. The gas filter should be installed in front of the pressure regulator and must be installed according to the gas flow direction indicated on it;
2. The gas filter is composed of washable synthetic materials. When installing the filter, the cover should be opened easily to facilitate cleaning and inspection.
3. The gas filter can be installed on the horizontal and vertical pipeline, do not install the filter on the unstable foundation
4. Before maintenance, please make sure that there is no gas in the gas filter. After that, remove the filter screen, clean it with corresponding detergent, then dry it naturally, and then re install it.
5. After installation, the sealing test must be done. During ventilation, the instantaneous air volume should not be too large.

 
   
       
 
  Maintenance and maintenance
 
       
 

1.鏃ュ父缁存姢銆佷繚鍏
銆銆a銆佺粡甯镐繚鎸佽鍚勮〃闈㈡竻娲併
銆銆b銆佽澶囧仠杞︽椂锛屽簲鍙婃椂鎸夎瀹氬蹇紑鐩叉澘 (娉曞叞鐩)鐨勫悇涓浆鍔ㄨ繘琛屾鼎婊戯紝寮闂儴浣嶇殑涓濇潬锛屽簲娑傛鼎婊戞补鑴. 鍏跺畠閮ㄤ綅涔熷敖閲忔秱娑︽粦娌硅剛. 瀵逛簬鏃犳硶娑傛鼎婊戞补鑴傜殑閮ㄤ綅锛屽彲娉 10#鎴20#鏈烘补銆
2. 杩愯鏃剁殑缁存姢銆佷繚鍏
銆銆a銆佸缓璁敱鎿嶄綔鑰呰礋璐h澶囧钩鏃剁殑缁存姢淇濆吇.
銆銆b銆佺粡甯镐繚鎸佽澶囪〃闈㈡竻娲併
銆銆c銆侀殢鏃剁洃娴嬪樊鍘嬭璇绘暟锛屽綋浣跨敤鍘嬪樊杈惧埌0.O2Mpa鏃讹紝
搴斿啿娲楁护鑺
3. 妫楠屽懆鏈
銆銆1) 鏈澶囩殑瀹氭湡妫楠屽繀椤讳弗鏍兼寜鐓р滃瑙勨濈鍏珷鐨勬湁鍏宠瀹氳繘琛屻
銆銆2) 姣忓勾鑷冲皯瀵规湰璁惧杩涜涓娆″叏闈㈡楠屻佽澶囧鍘氱殑娴嬭櫧锛屾瘡涓ゅ勾瀵硅澶囩殑鎵垮帇鐒婄紳杩涜鏃犳崯妫娴嬨傛墍鏈夌殑妫楠屻佹娴嬬粨鏋滐紝搴旇鍏ヨ澶囩殑鎶鏈尅妗堛
銆銆3) 璁惧鍐呴儴鏈夊帇鍔涙椂. 涓嶅緱杩涜浠讳綍缁翠慨銆傚浜庣壒娈婃儏鍐典笅鐨勭淮淇. 蹇呴』涓ユ牸閬靛畧鈥滃瑙勨濈 122鏉$殑瑙勫畾杩涜銆
4. 闀挎湡鍋滄斁鏃剁殑缁翠慨淇濆吇
銆銆1) 鏈澶囬暱鏈熷仠鏀炬椂. 搴斿皢璁惧鍐呮恫浣撴帓鍑銆
銆銆2) 鍏抽棴鎵鏈夐榾闂ㄣ
銆銆3) 灏嗚澶囪〃闈㈠交搴曟竻鐞嗗共鍑銆
銆銆4) 鎵鏈夎浆鍔ㄩ儴浣嶆秱闃叉补鑴傘
銆銆5) 鐢ㄥ竼甯冨皢璁惧鍏ㄩ儴鐩栦笂锛岄槻姝㈠皹鍨㈡矇绉湪璁惧琛ㄩ潰銆

杩囨护鍣ㄩ夊瀷闇鎻愪緵鐨勫弬鏁帮細杩囨护浠嬭川銆******浣跨敤鍘嬪姏涓庡彛寰勩

1. Daily maintenance
a. Always keep the surfaces clean.
b. When the equipment is shut down, each rotation of the quick opening blind plate (flange cover) shall be lubricated in time according to the regulations. The lead screw at the opening and closing parts shall be coated with lubricating grease. Other parts shall also be coated with lubricating grease as far as possible. For parts that cannot be coated with lubricating grease, 10 # or 20 # oil can be injected.
2. Maintenance during operation
a. It is suggested that the operator should be responsible for the normal maintenance of the equipment
b. Always keep the surface of equipment clean.
c. Monitor the reading of the differential pressure gauge at any time. When the differential pressure reaches 0.o2mpa,
The filter element should be flushed.
3. Inspection cycle
1) The regular inspection of the equipment must be carried out in strict accordance with the relevant provisions of Chapter VI of the "capacity regulation".
2) Carry out comprehensive inspection and wall thickness measurement for the equipment at least once a year, and carry out non-destructive testing for pressure bearing welds of the equipment every two years. All inspection and test results shall be recorded in the technical file of the equipment.
3) No maintenance is allowed when there is pressure inside the equipment. For the maintenance under special circumstances, it is necessary to strictly comply with the provisions of Article 122 of the "capacity regulation".
4. Long term maintenance
1) When the equipment is parked for a long time, the liquid in the equipment should be drained.
2) Close all valves.
3) Clean the surface of the equipment thoroughly.
4) Apply anti grease to all rotating parts.
5) Cover the equipment with canvas to prevent dust from depositing on the surface of the equipment.
Parameters for filter selection: filter medium, maximum pressure and diameter.

 
   
       
  鐕冩皵杩囨护鍣  
       

back
 
Home        Product        About Us        Our city        Site Map
Tell:86-755-25887166    Email:ywh1995@126.com    Company:SHENZHEN YAWEIHUA INDUSTRY CO.,LTD.
Copyright© 1995 - 2009 Egypt.com Inc. All rights reserved