Your current location:home > Product

Your current location:home > News > News Details

Exhibition

Xinjiang oil field gas metering system reform ready

6 August, xinjiang oilfield oil and gas storage and transportation company petrochemical points lose station and shihezi door station natural gas metering system reconstruction project construction bidding prepared, the transformation is about to begin. Engineering will be through the natural gas metering system transformation, and meet the downstream user growing gas demand.

Oil and gas storage and transportation company governs the xinjiang oil field more than 3700 kilometers of oil and gas pipelines, mainly in xinjiang oilfield for oil and gas transportation and sales task. At present, the company gas daily external throughput for 11 million cubic meters, for maximum satisfy border gas downstream user needs to provide a solid guarantee.

Petrochemical points lose station will be located in miquan county territory, was completed in 2003, at first just for urumqi petrochemical company air supply. With the new rapid gas co., LTD., xintai company and other users to join, the system can't meet the forward gas measurement requirements.

Shihezi door station will be located in shihezi city, built in November 2008 the revamping, mainly responsible for shihezi to extension north company and the gas company. With the increasing demand of shihezi planning gas, matching is beyond existing meter equipment measuring range.

In order to solve measurement problem of oil and gas storage and transportation company sales metering management personnel site survey gas pipeline network measurement device, focuses on the petrochemical points lose station and shihezi door station air supply duct repeated investigation. In consult technical data at the same time, the management of collect user 10 years gas demand, comprehensive analysis, finally complete petrochemical points lose station and shihezi door station natural gas metering system reform scheme.

Natural gas metering system reconstruction project will lose in petrochemical points stand new two sets of measuring device, accurate measurement to urumqi and wujiaqu city supply of natural gas; In shihezi door stood expansion a set of measurement system, the process can meet the shihezi area 10 years gas planning.

Up to now, the equipment material selection, purchase has been completed. The end of August is expected to start construction.
 

Home        Product        About Us        Our city        Site Map
Hotline:400-089-7166 Tell: 86-755-25887166    Email: ywh1995@126.com    Company: SHENZHEN YAWEIHUA INDUSTRY CO.,LTD.
Copyright© 1995 - 2009 Egypt.com Inc. All rights reserved