Your current location:home > News > News Details
Exhibition
as been in a state of conglutination between China and Russia natural gas price negotiation, again into bust, both sides because the price differences huge, the end of the seventh meeting.
Although talks fail, but the reporter learned that, at present is responsible for the introduction of Russian gas in oil, there is no "lay down and die", but and liaoning, jilin, heilongjiang government and enterprise contact, plan the future advance laid can accept Russian natural gas pipeline, and in the end reach between gas pipeline laying intention, and natural gas pipeline to eastern China and Russia.
However, in view of the Russian gas supply risks, the pipeline fund investors in addition to petrochina outside, for nobody came.
Butt pipeline layout in advance
"We really have the planning, construction a from qinhuangdao to Harbin gas pipeline. Petrochina news department personage to the China business news reporter confirmed.
The reporter understands, earlier this year, petrochina began to plan a starting point for qinhuangdao, way dalian, shenyang, changchun and Harbin nearly kilometers of gas pipeline.
However, the gas pipeline route area and the previous line different, "according to conventional, natural gas pipeline route area should is the lack of natural gas area, however, this pipeline peripheral include daqing oilfield, a number of the natural gas production regions." Analysis of industry experts said, "this pipeline may have more important meaning."
Reporter in the oil in the verification confirmed that the pipeline, have introduced the idea of Russian gas.
It is understood that the chose in the northeast section on construction, on the one hand, because China and Russia (natural gas pipeline will be introduced from northeast China, however, due to the Japanese hope to the equation, so the design of the eastern and introducing Chinese sites have been in negotiations and not sure, can only preliminary expected in northeast China.