Your current location:home > Product

Your current location:home > News > News Details

China Gas Information

West-east gas transmission pipeline company: a number of measures to prevent pipe ice blocking the f

  Since the middle of January, south China appear in most parts of the snow and cool weather. South shaanxi, hubei, anhui and jiangsu appear sleet and snow. The bad weather on the different level of west-east gas transmission pipeline route 16 management office 116 seats of the station yard operation. West-east gas transmission pipeline company elaborate organization, actively, formulate measures to ensure smooth gas pipeline safety.

Staff in check the equipment.

  Management authority after the change, west-east gas transmission pipeline company now manage the administrators for 9099 km pipeline. Pipeline through 14 provinces, cities and autonomous regions, gas supply range covers east China, central China, south China and the east part of northwest China broad areas, and to turn in north China for natural gas. Up to now, west-east gas transmission pipeline company sales and points for natural gas users lose by 186.

  The company network optimization operation, making full use of gas storage, gas source added load load and can disrupt library user load and so on many kinds of means; Jiangsu LNG terminal in advance and communication, make winter of liquefied natural gas (LNG) purchasing plan, to ensure smooth winter gas supply. The company actively coordinate users, according to the available resources, it may appear in the extreme weather, to do stop for part of the industry and reduce the user and can disrupt users work, limiting new gas project, control gas peak too rapidly, completes the winter for the natural gas.

  "West-east gas pipeline and the company made a period of the natural gas sales plan, strengthen the user management, efforts to control gas peak winter. According to the upstream resources, pipeline transport capacity and downstream market demand, west-east gas transmission pipeline company as a whole and each link, follow up user needs change, to make every preparation, and control gas peak winter; Enhancing resources optimization allocation, distinguish between your priorities are to realize the resource supply and market demand balance, make sure to residents, utilities and key city gas safe and smooth.

  The company organization on the pipeline 16 sets of ice jams and agent device, and the new purchase of 10 sets the device, the allocation to have frozen plugging risk losing points station, carry out along the route and the ice blocking the heat pump car repair equipment and the frost heave emergency DongFang heat preservation measures to ensure the safety of winter air supply.

  West-east gas transmission pipeline company organization 2049 item of equipment maintenance and pipe head hot work, to ensure that equipment intact rate of 98% or more, make dimensional maintenance and hidden trouble testing, ensure gas pipe into peak capacity to meet demand; Give full play to the gas storage reservoir injection-production potential, the preparatory gas load. In August 2011, jintan gas storage reservoir began to load for a winter gas injection, at present the emergency sampled gas for 82 million cubic meters, the biggest, sampled gas for 6 million cubic meters. Early November 2011, gas storage liuzhuang store put into production and began to gas injection, to improve the gas storage load performance of the reservoir to lay the foundation.
 

Home        Product        About Us        Our city        Site Map
Hotline:400-089-7166 Tell: 86-755-25887166    Email: ywh1995@126.com    Company: SHENZHEN YAWEIHUA INDUSTRY CO.,LTD.
Copyright© 1995 - 2009 Egypt.com Inc. All rights reserved