Your current location:home > Product

Your current location:home > News > News Details

China Gas Information

Innovation to bring benefit and optimization in fuxin coal gas company implemented


    September 6,, through the reporters know, liaoning fuxin datang international coal gas engineering is the national "863" plan of major scientific and technological research and development projects, has the country "build coal chemical industry field coal gas demonstration project" assignment. Through the key scientific and technological problems, the company save engineering investment, reduce project cost 343.74 million yuan. In the project construction, the company from construction project of domestic quality project target of the top design, advanced well and high-quality goods, comprehensive planning to optimize the design, realization integrated innovation of science and technology, a large number of science and technology achievements on gradually revealed.

    Specific optimization process is divided into four steps: the implementation of overall plane go system optimization design. Implement main device system optimization design. Implementation of production assistant system optimization design. To implement safety guarantee system optimization design.

    Liaoning fuxin datang international coal gas company in the success of the project to give us some shut gas engineering brought can reference model, hope we can through the continuous optimization, make more benefits the country and the good engineering.
 

Home        Product        About Us        Our city        Site Map
Hotline:400-089-7166 Tell: 86-755-25887166    Email: ywh1995@126.com    Company: SHENZHEN YAWEIHUA INDUSTRY CO.,LTD.
Copyright© 1995 - 2009 Egypt.com Inc. All rights reserved